This morning, I had two calls for reservations. I just can’t take any reservations until at least December 13. But that’s good the word is getting out! We hope to call for the Certificate of Occupancy on December 2nd and move in on the 3rd. Cross your fingers that we pass the inspection!
It is very busy at Bedford Landings. We have trim carpenters, central vacuum installers, painters, kitchen installers, granite fabricators, carpet installers, hardwood shoe molding installers, and driveway pavers. Tomorrow we add back the tile guys for final grouting.
I am trying to keep up by vacuuming edges before trim goes down, stain trim, and stain around doorknob holes so the knobs and locks can be put on the doors. I met with the lighting consultant (Ferguson’s) on final orders, then met with the kitchen designer (Elegant Designs by Sheryl) then ordered cabinet knobs and faucets.
Jack has continued to be interrupted by contractors needing to know various things but has finished the railing for the back basement steps, completed the front porch railing and been completing wiring lights and outlets on the Fourth bedroom. Phew!
Here are some photos:
Thanks to our followers and your continued support of our dream!
Looking fantastic, Karen and Jack! So excited for you!!! A dream about to come true!