Update from Bedford Landings January 2013

Posted on January 9, 2013 by Bedfordlandings

The weather is beautiful this week for building a floor.  I can just imagine the lake view from our Master Suite.  Jack and Crew are 2/3 the way through putting the first floor down.

Floor2_Annotated

I laid down in the garage floor and looked up at the blue sky to take this photo.FloorJoists_Sky

This is a view of our worthy crew at work yesterday and today.  The flooring is an “AdvanTech” tongue and groove flooring system. Each piece has to be hammered into place to link into the piece beside it then screwed down.

Floor_BillKoontz

Theatre Room

This will eventually be the room that shows great features such as “The Great Waldo Pepper” and “Dreamgirls!”

2 Comments

Jennifer K. Smith on January 9, 2013

Way to go!!

Phillip Denton on January 9, 2013

I can't wait to check in!!

Leave a Comment





Follow

Get every new post on this blog delivered to your Inbox.

Join other followers: